Hoppa till innehåll

  • Start
  • Nyheter
  • Om Programmet
    • Varför STS?
    • Fördjupning om programmet
    • Ämnesöversikt
    • Intervjuer
  • Arbetsmarknad
  • För studenter
    • Studieresurser
    • C-uppsatser
    • Utlandsstudier
  • Examensarbete
    • Att skriva examensarbete
    • Platsannonser
    • Registrera examensarbete
    • Boka tid för presentation
    • Listor över examensarbeten
    • Kommande Exjobbspresentationer
Sök

To site or not to site: A framework development for battery energy storage system siting using data-driven insights

Information

Författare: Tyra Malmström, Erik Sterner
Beräknat färdigt: 2025-06
Handledare: Andreas Langholz
Handledares företag/institution: Ingrid Capacity
Ämnesgranskare: Robert Eriksson
Övrigt: -


Presentationer

Presentation av Tyra Malmström
Presentationstid: 2025-06-11 14:15

Presentation av Erik Sterner
Presentationstid: 2025-06-11 15:15

Opponenter: Amanda Widlund, Maria Lindström

Abstract

The objective of this study was to develop a structured framework for identifying suitable locations for battery energy storage systems (BESS) in Germany. The framework was constructed using insights from literature, German grid information and expert dialogs. The framework combines technical, economic and spatial factors relevant for BESS siting. To test the practical use of the framework, a case study was conducted based on the 110 kV grid in northeast Germany. A simplified power grid model was constructed in Python using PandaPower and included wind power injection, regional demand and three potential BESS locations.

The framework focused on evaluating how relevant each identified siting factor is and how the factor could be applied using publicly available open data. By mapping the importance of each factor against its data availability, a four-field analysis was performed to determine which factors are most suitable for inclusion in an initial screening tool. The result of the framework shows that residual energy, proximity to substations and land suitability was the factors with the highest relevance and most available data. The case study shows that Lubmin and Greifswald perform similarly well as BESS sites, while Wolgast shows significantly lower total usage and is less suitable for BESS placement.

The study concludes that the framework enables initial BESS siting selection based on the identified factors and open data. Further development could integrate economic factors, larger regional data set of Germany and automated decision making.

Ladda ner rapporten

To site or not to site: A framework development for battery energy storage system siting using data-driven insights
  • Start
  • Nyheter
  • Om Programmet
    • Varför STS?
    • Fördjupning om programmet
    • Ämnesöversikt
    • Intervjuer
  • Arbetsmarknad
  • För studenter
    • Studieresurser
    • C-uppsatser
    • Utlandsstudier
  • Examensarbete
    • Att skriva examensarbete
    • Platsannonser
    • Registrera examensarbete
    • Boka tid för presentation
    • Listor över examensarbeten
    • Kommande Exjobbspresentationer

Inlogg

  • Logga in
  • Flöde för inlägg
  • Flöde för kommentarer
  • WordPress.org

Kontakt

Hemsideansvarig
Studievägledare
STS-sektionen

Andra webbplatser

Uppsala Universitet
Schema
Antagning.se
Antagningsstatistik
Hittatenta.se
STS-sektionens hemsida

 

Integritetspolicy | STS-programmet 2024