Hoppa till innehåll

  • Start
  • Nyheter
  • Om Programmet
    • Varför STS?
    • Fördjupning om programmet
    • Ämnesöversikt
    • Intervjuer
  • Arbetsmarknad
  • För studenter
    • Studieresurser
    • C-uppsatser
    • Utlandsstudier
  • Examensarbete
    • Att skriva examensarbete
    • Platsannonser
    • Registrera examensarbete
    • Boka tid för presentation
    • Listor över examensarbeten
    • Kommande Exjobbspresentationer
Sök

Ballast eller ballastfritt, det är frågan. Modellförslag för nyttoutvärdering av järnvägskonstruktion med icke-monetära utvärderingskriterier för två olika järnvägstyper.

Information

Författare: Madeleine Persson
Beräknat färdigt: 2020-06
Handledare: Pär Sandin
Handledares företag/institution: Systecon
Ämnesgranskare: Mattias Lantz
Övrigt: -


Presentation

Presentatör: Madeleine Persson
Presentationstid: 2020-06-17 11:15
Opponent: Fabian Persson

Abstract

To cut transport carbon dioxide emissions by 70% by the year of 2030, the Swedish government are investing in new railway infrastructure, hoping to stem the emissions caused by the transport sector. It is planned to stretch between Stockholm–Malmö and Stockholm–Gothenburg. The first section Ostlänken, is located between Järna in Södertälje municipality (Stockholm) and Linköping. It will be a 160 kilometre long railway with dubble track in ballast. All railways in Sweden are built with ballast, but internationally, ballast free methods, so called slab track are increasing in popularity. This master thesis aims to compare ballast tracks with slab track, in regard to carbon dioxide emissions. The study also aims to evaluate how several criteria can be compared to each other as non-monetary, in an evaluation model. Three criterions will be considered: availability, economic costs and carbon dioxide emissions.

A case study of Ostlänken was used as a methodological framework. Further, a literature review has been implemented as well as several interviews. Calculations of carbon dioxide emissions from the two tracks respctively were performed through a life cycle analysis (LCA). Through a multicriteria analyse, the three criteria were evaluated in respect to each other. All calculations were performed in Excel.

The result that could be drawn from the study, was that from a carbon dioxide point of view, ballast tracks have a much greater need for maintenance to remain track geometry. Slab track on the other hand, generate higher emissions in the start of the LCA, due to its large amount of concrete and steel. Multicriteria analyse were shown to be a helpful tool when making decisions in complex systems. The multicriteria analyse could benefit from including other case specific factors as well. This might however also lead to a far too complex model, from which more conclusions can be drawn.

Ladda ner rapporten

Ballast eller ballastfritt, det är frågan. Modellförslag för nyttoutvärdering av järnvägskonstruktion med icke-monetära utvärderingskriterier för två olika järnvägstyper.
  • Start
  • Nyheter
  • Om Programmet
    • Varför STS?
    • Fördjupning om programmet
    • Ämnesöversikt
    • Intervjuer
  • Arbetsmarknad
  • För studenter
    • Studieresurser
    • C-uppsatser
    • Utlandsstudier
  • Examensarbete
    • Att skriva examensarbete
    • Platsannonser
    • Registrera examensarbete
    • Boka tid för presentation
    • Listor över examensarbeten
    • Kommande Exjobbspresentationer

Inlogg

  • Logga in
  • Flöde för inlägg
  • Flöde för kommentarer
  • WordPress.org

Kontakt

Hemsideansvarig
Studievägledare
STS-sektionen

Andra webbplatser

Uppsala Universitet
Schema
Antagning.se
Antagningsstatistik
Hittatenta.se
STS-sektionens hemsida

 

Integritetspolicy | STS-programmet 2024